New Arrivals are Here-Fast Shipping from Our USA Warehouse

Metal scaffolding - Couplers and fittings - Couplers and fittings outside the scope of BS EN 74. Requirements and test methods Ingestion-build-79769 which needs to be respected

$116.00

Quantity
Description

which needs to be respected

1 concerning inspection documents have been updated

The construction of the trampoline ensures that during play (or movement of the trampoline) the assembled joints cannot become dislodged

Why should you use BS IEC 60605-6 – Equipment reliability testing

since new parts of such systems cannot usually be isolated during the testing

Metal scaffolding - Couplers and fittings - Couplers and fittings outside the scope of BS EN 74. Requirements and test methods Ingestion-build-79769 which needs to be respected1 Scope This section of BS 11392 specifies requirements and test methods for aluminium couplers, steel putlogcouplers and ancillary fittings outside the scope of BS EN 74, for use in scaffolds and falsework constructed with steel scaffold tubes conforming to BS EN 39: 2001, Type 3 or Type 4, or aluminium scaffold tubes conforming to BS 11391. 2. It is applicable to: aluminium right angle, swivel and sleeve couplers; steel putlogcouplers, expanding

Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.

View More

  • Product more
  • Collection:

You may also like

recommand products

50$ Store Credit
Your message